Task
A task is an action to be undertaken and is defined by its status. An active task is a task which has an active status. In the user interface. PageSeeder uses the icon for tasks.
When a discussion includes at least one comment with a status, it becomes a task – the status of the last comment in a discussion is the task status.
Like comments, tasks can be created against the following:
- Group – means that the task hasn't been attached to any specific content.
- Document or version – relates to the entire document.
- Fragment – attaches the task to a specific point in the document.
A task has the following configurable properties:
Creating tasks
PageSeeder assumes that tasks naturally arise from discussions. For that reason, any discussion can be turned into a task by setting the status on a comment. Once a comment has a status, PageSeeder identifies it as a task in the user interface.
Although any comment can have a status, this can only be done through the user interface. You cannot change the properties of a task by email.
The description of the task is contained in the discussion; typically, it is in the first comment that has an active status (for example, “Open”).